Gallery of main projects

Klaipėdos nafta, 2018
     

Klaipėda oil terminal

Client: Klaipėdos nafta AB
Project duration: 2018–2019
Implemented works: Installation of storage tanks 2x10.000 m³ (carbon steel) and 2x5.000 m³ (duplex steel), pipeworks and technological equipment. Manufacturing and installation of steel structures.

 
           
BEGA, 2018
     

Cement terminal, Klaipeda

Client: Klaipeda stevedoring company „BEGA“
Project duration: 2017–2018
Implemented works: Silos design, fabrication and installation.

 
           
Druskininkai, 2018
     

Druskininkai city boundary mark

Client: Druskininkai city municipality
Project duration: 2018
Implemented works: Manufacturing and installation of steel structures.

 
           
Pilaitės bažnyčia, 2017
     

Church, Vilnius

Client: KONGERA
Project duration: 2017
Implemented works: Manufacturing and installation of steel structures.

 
           
Būtingės naftos terminalas, 2017
     

Būtingė oil terminal

Client: ORLEN Lietuva AB
Project duration: 2017
Implemented works: Installation of storage tank 52 000 m³, pipeworks and technological equipment. Manufacturing and installation of steel structures.

 
           
Salaspilis CHP plant, 2016
     

CHP plant in Salaspilis, Latvia

Client: HoST LV
Project duration: 2016
Implemented works: Pre-fabrication of piping components from low carbon, alloyed and stainless steel. Labelling of the technological pipework and equipmen

 
           
Lizums power plant, 2016
     

CHP plant in Lizums, Latvia

Client: HoST LV
Project duration: 2016
Implemented works: Pre-fabrication of piping components from low carbon, alloyed and stainless steel. Labelling of the technological pipework and equipment

 
           
BEGA, 2015
     

Liquid fertilizers terminal, Klaipeda

Client: Klaipeda stevedoring company „BEGA“
Project duration: 2014–2015
Implemented works: Tanks and piping installation.
 
           
Merkinės apžvalgos bokštas, 2015
     

Merkine overlook tower

Client: Dzukijos nacionalinis parkas
Projekt duration: 2014–2015
Implemented works: General project contracting.  Manufacturing and installation of steel structures. General construction works

 
           
Lifosa, 2014
     

Sulphuric acid contact equimpent

Client: Lifosa AB
Project duration: 2013–2014
Implemented works: Technological equipment installation. Total weight of installed stainless steel equipment more than 800 tonnes.

 
           
Akmenės cementas, 2013
     

Dry process clinker production line

Client: Akmenės cementas AB
Project duration: 2011–2013
Implemented works: Technological equipment installation. Total weight of installed steel equipment more than 7 600 tonnes.

 
           
Lifosa, 2013
     

Spherical liquid ammonia storage tanks

Client: Lifosa AB
Project duration: 2012–2013
Implemented works: Technological ammonia pipework installation
The project was awarded a gold medal in a category Product of the Year 2013

 
           
Fortum Klaipėda, 2013
     

Fortum Klaipėda CHP plant

Client: ALSTOM, Fortum Klaipėda UAB
Project duration: 2011–2013
Implemented works: Manufacturing and installation of stainless steel storage tanks. Technological pipework and equipment installation

 
           
Rygos TEC-2