Merkinės apžvalgos bokštas, 2015
      Merkine overlook tower

Client: Dzukijos nacionalinis parkas
Projekt duration: 2014–2015
Implemented works: General project contracting.  Manufacturing and installation of steel structures. General construction works
 
           
Lifosa, 2014
      Sulphuric acid contact equimpent

Client: Lifosa AB
Project duration: 2013–2014
Implemented works: Technological equipment installation. Total weight of installed stainless steel equipment more than 800 tonnes.
 
           
Akmenės cementas, 2013
     

Dry process clinker production line

Client: Akmenės cementas AB
Project duration: 2011–2013
Implemented works: Technological equipment installation. Total weight of installed steel equipment more than 7 600 tonnes.

 
           
Lifosa, 2013
     

Spherical liquid ammonia storage tanks

Client: Lifosa AB
Project duration: 2012–2013
Implemented works: Technological ammonia pipework installation
The project was awarded a gold medal in a category Product of the Year 2013

 
           
Fortum Klaipėda, 2013
     

Fortum Klaipėda CHP plant

Client: ALSTOM, Fortum Klaipėda UAB
Project duration: 2011–2013
Implemented works: Manufacturing and installation of stainless steel storage tanks. Technological pipework and equipment installation

 
           
Rygos TEC-2
     

TEC-2 420 MW CHP plant in Riga, Latvia

Client: Latvijas Energoceltnieks, GAMA Power Systems, Latvenergo
Project duration: 2011–2013
Implemented works: Pre-fabrication of piping components from low carbon, alloyed and stainless steel. Labelling of the technological pipework and equipment

 
           
Snow Arena, 2012
     

Snow Arena in Druskininkai

Client: Skirnuva UAB, Druskininkai Municipality
Project duration: 2011–2012
Implemented works: Manufacturing of steel structures

 
           
Amilina, 2012
     

Starch and glucose production line

Client: Amilina AB
Project duration: 2009–2013
Implemented works: Manufacturing and installation of steel structures. Technological pipework and equipment installation. Manufacturing of silos and storage tanks, modification and installation
The project was awarded a gold medal in a category Product of the Year 2012

 
           
Lietuvos elektrinė, 9 blokas
     

455 MW CHP gas turbine unit for the Lithuanian Power Plant

Client: Iberdrola, Lithuanian Power Plant
Project duration: 2010–2012
Implemented works: Pre-fabrication of piping components from low carbon and stainless steel. Technological pipework and equipment installation. Manufacturing and installation of storage tanks

 
           
Elektrinė Augustė, 2011
     

Augustė 47 MW CHP plant

Client: Aalborg Engineering, Achema AB
Project duration: 2009–2011
Implemented works: Manufacturing and installation of steel structures. Technological pipework and equipment installation
The project was awarded a gold medal in a category Product of the Year 2011

 
           
Lifosa, 2010
     

Phosphate production line

Client: Lifosa AB
Project duration: 2009–2010
Implemented works: Manufacturing and installation of steel structures and technological equipment. Manufacturing and installation of 800 meters long transporter
The project was awarded a gold medal in a category Product of the Year 2010

 
           
PC Ozas, 2009
     

OZAS shopping centre

Client: Kayi Construction
Project duration: 2008–2009
Implemented works: Manufacturing and installation of steel structures

 
           
Panevėžio energija, 2009
     

35 MW thermal power plant in Panevėžys

Client: Panevežio energija AB
Project duration: 2008–2009
Implemented works: Manufacturing and installation of steel structures. Installation of gas and steam turbines. Technological pipework and equipment installation

 
           
AD Rem logistikos centras Vilniuje, 2008
     

AD Rem logistics centre in Vilnius

Client: AD Rem UAB
General contractor: AB Montuotojas Vilnius branch
Project duration: 2007–2008
Implemented works: Manufacturing and installation of steel structures. Installation of gas and steam turbines. Technological pipework and equipment installation. General construction works

 
           
Mestilla, 2007
     

Methyl ester plant in Klaipėda

Client: Mestilla UAB
General contractor: Montuotojas AB,  Panevėžys branch
Project duration: 2006–2007
Implemented works: General project contracting.  Manufacturing and installation of steel structures. Storage tanks, pipeworks and technological equipment installation. General construction works
The project was awarded a gold medal in a category Product of the Year 2007

 
           
SWEDSPAN Girių Bizonas, 2007
     

Chipboard manufacturing plant in Kazlų Rūda

Client: SWEDSPAN Girių Bizonas UAB
Project duration: 2006–2007
Implemented works: Manufacturing and installation of steel structures. Technological equipment manufacturing and installation. Manufacturing and installation of drum dryer. Manufacturing and installation of chimneys, steel chimney liners, air ducts and filters

 
           
KLASCO, 2004
     

Bulk mineral fertilizer terminal in Klaipėda

Client: Klaipėdos jūrų krovinių kompanija (KLASCO) AB
Project duration: 2003–2004
Implemented works: Manufacturing and installation of steel structures. Technological equipment manufacturing and installation
The project was awarded a gold medal in a category Product of the Year 2004

 
           
Linas Agro grūdų saugykla Joniškyje, 2003
     

Grain storage facility in Joniškis

Client: Linas Agro AB
Project duration: 2002–2003
Implemented works: Manufacturing and installation of steel structures. Technological equipment manufacturing and installation. Storage tanks installation
The project was awarded a gold medal in a category Product of the Year 2003

 
           
Sportima, 2001
     

Sportima roofed football hall

Client: Department of Physical Education and Sports under the Government of the Republic of Lithuania
General contractor: Montuotojas AB, Vilnius branch
Project duration: 1999–2001
Implemented works: General project contracting. Manufacturing and installation of steel structures. General construction works
The project was awarded a gold medal in a category Product of the Year 2001

 
           
Geoterma, 2000
     

Pilot geothermal plant in Klaipėda

Client: Geoterma UAB
Project duration: 1999–2000
Implemented works: General project contracting.  Manufacturing and installation of steel structures. Technological equipment manufacturing and installation. Storage tanks, pipeworks and technological equipment installation. General construction works
The project was awarded a gold medal in a category Product of the Year 2000

 
           
Būtingės naftos terminalas, 1999
     

Būtingė oil terminal

Client: Mažeikių nafta AB
Project duration: 1997–1999
Implemented works: Installation of storage tanks (3 x 50 000 m³), pipeworks (> 45 km) and technological equipment. Manufacturing and installation of over 4 000 tonnes of steel structures
The project was awarded a gold medal in a category Product of the Year 1999

 
           
Televizijos bokštas Vilniuje
     

Historical projects

Manufacturing and installation of structural and rotating components for the Vilnius TV Tower observation deck
Manufacturing and installation of steel structures, stage operation and lifting components for the Lithuanian National Opera and Ballet Theatre
Manufacturing and installation of structures for the Vingis Park open air stage